Because the asphalt mixing equipment is relatively large, and the structure is also more complex, so before disassembly should be based on the location and the actual situation to develop a practical disassembly plan, and the relevant staff to explain.
At the same time, it is necessary to do a good job of inspection of equipment and its parts, to ensure that the equipment's power, water, gas sources, etc. are turned off.

Because the asphalt mixing station site situation is complex, in the use of related equipment, the need to be carried out in accordance with the correct standards, for the operator's requirements is, must bear in mind with the equipment in the process of use of the relevant considerations, must be done to do things in place, the prohibited matters must be avoided, these are in fact related to the production situation Closely related.

Asphalt mixing equipment After use needs to be disassembled, cleaned, maintenance and other work to be preserved, in order to facilitate the next use.
Not only is the disassembly process of the equipment important, but the previous preparation also has a greater impact, so it is not sloppy.
Please follow the detailed description below for details.

.


In addition, asphalt mixing equipment should be removed before disassembly should be used to identify it, especially electrical equipment, but also to add part of the marker symbol, can provide the basis for the installation of equipment.
In order to ensure the installation of the operation, the disassembly should be selected with the appropriate equipment, disassembly of the parts to be properly kept, can not be lost or damaged.

n

According to normal conditions, in order to ensure the quality of the project, a project only allows the establishment of an asphalt mixing station, or according to the zoning of the mixing station, can also be set up a large mixing station and then with the appropriate amount of concrete conveyor, these can be adjusted according to the actual situation.
Each mixing station should then be equipped with one to two pools, which is to protect the concrete mixing in the operation and the water requirements for mechanical cleaning work.

n

Before the equipment starts working, the staff should do a series of preparatory work first.
Although these work content may seem cumbersome, but the importance of the work can not be ignored.
The specific work contents are as follows: (1) The material around the conveyor belt should be cleaned up before starting; (2) The first empty test run for a period of time, until the motor is in normal operation before it can officially start working; (3) in the asphalt mixing station work process, it is necessary If you find any problems, should be resolved in a timely manner, until the repair is normal before you can start working again.

.

Mixing method should be appropriate, the need for hydrolysis after the use of not dry mix, the need for powdery mixing of the agglomeration can not be used, such as water reducer or aerated agent, the control of the poor will be in the concrete to present a soft solid group, in the solid concrete to form pores.
The gesture will be in stable control.

n

Daily arrangements should be arranged for a certain inspector to inspect the production situation, if a problem is found, to be recorded and dealt with, so that you can better grasp the overall condition of the equipment.
For the maintenance of asphalt mixing plant should be treated with the correct ideas and ideas, this is not an overnight work, the need for long-term adherence.

n

In addition, in the establishment of asphalt mixing plant, should also be configured with the corresponding cement silo, in accordance with the principle of being able to meet the needs of concrete production, at the same time can not appear the situation of cement backlog, can be used separately and alternately.
Finally, we should also consider the delivery of the finished product, should be in accordance with the same time to meet the transmission distance and height and the supply of concrete as the standard to implement.

n

So, when setting up Asphalt Batch Mix Plant mixing station, what should be done? In view of the importance of its operations, for the construction of the station, it is necessary to combine the actual situation, according to the correct method.
Then the first step in building a station is to determine the host and feed batching system, and to be able to meet the maximum daily concrete dosage as the basic principle.

n

Therefore, in order to ensure the smooth progress of the project, every staff member should be in accordance with high standards to demand their own, for example, for strictly prohibited things, in the asphalt mixing plant equipment use process, in order to prevent the impeller damage, operators must not be in the stirring impeller by solid buried under the circumstances of the start of the equipment; It is also not allowed to collide with the axle mating surface of the device or to hammer.
Moreover, the test run should be carried out after the feeding, and it should not be operated without load.