Kitchen remodel done!

From the first cabinet out to having the floor down and the new cabinets installed was 9 solid days of work. After that I did it in pieces, getting the vent hood installed, we have to wait several weeks for counters to be made and installed then we picked out backsplash after it was all done so that we could ensure that it looked right. The backsplash install took 2 days and then another for the grouting. Another day to do all of the finish work (cabinet lighting molding and side panels.

Edit, total time in days if I was able to keep at it without going to work, about 2 weeks, since I had to work, about 2 months. The main body of work was 9 days from first cabinet out to being able to use the kitchen again

Price breakdown (approximate)

Ditra: $400 Tile: $900 Mortar: $150 Tile saw: $275 Mixer:$75 Cabinets: $2,000 (including lighting and finish panels) Granite Counter: $2,800 Backsplash ($1000 including grout, mosaic, mastic, and glass tile cutting blade) Vent hood $150 Stove: $1000 Sink and faucet $450 New plumbing parts $50

Had a bunch of other small things that I had to buy, new hardware, paint, tools, blades for saw and oscillating saw to take linoleum off, extra underlayment to level the floor with other parts (we put the tile throughout the entire downstairs,)

Kitchen total was probably between $10,000 and $11,000 with miscellaneous stuff, and the entire downstairs renovation cost around $17,000